ClimaSelect building energy analysis

From floor plan
to savings report
in under 15 minutes

Three steps. No consultants. Payback on day one.

Request Early Access
Floor plan parsing example
Step 1

Upload your drawings, photos and electricity bills

Scanning in progress_
Floor area2,000 – 5,000 sq m
Number of floors8 floors
Facades with max. exposureWest · East
Roof typeAccessible flat

Upload floor plan and site plan to update these automatically.

Step 2 below
Step 2

Fill in a few more details

Location
Occupancy Type
Envelope Material
Mostly Glass
% of total facade area70%
Brick & Masonry
RCC & Concrete
Composite Panel
% of total facade area30%
Natural Stone
Lighting & Ventilation
Lighting system
HVAC system
Water Management

Does the building have an STP?

Planned technology
Location
Total STP footprint
Area (sq m)
Height of space (m)
Who will operate it?

Does the building have dual plumbing?

Rainwater from roof
Step 3

View Recommendations

As-built vs upgraded

BeforeSingle-glazed · Chiller + FCU
Before upgrade
As-built condition
AfterFins + Glazing + VRF
After upgrade
With upgrades
Current Baseline
EPI285kWh/m²/yr
Energy cost₹42L/yr
Carbon680tCO₂/yr
After Upgrades (Glazing + Fins + VRF)
EPI
195kWh/m²/yr-32%
Energy cost
₹28L/yr-32%
Carbon
460tCO₂/yr-32%
Upgrades — Ranked by payback period
Glazing upgrade
Low-E Double Glazing — all façades
Before glazing
As-built: Standard glazing
After glazing
Low-E Glazing Upgraded
Savings
₹ 6.1 L/yr
Payback
3.1 yrs
Shading fins + VRF systemDesign stage
Fins reduce peak load on East & West facades — enabling a smaller, cheaper VRF system
₹ 5.5 L/yr
6.5 yrs payback
Cool-roof coating + 75mm insulation
₹ 1.4 L/yr
2.2 yrs payback
Demand-controlled BMS ventilation
₹ 1.8 L/yr
5.5 yrs payback
STP upgrade + dual plumbing
6,000 LPD
≈ 1 water tanker per day
Payback depends on tanker dependency
Download ClimaBuild Report

Want this for your actual building?

Leave your email — we'll get in touch.